# How to Read a Crane Specification Sheet: A Line-by-Line Guide

Two crane specification sheets sit side by side, with nearly identical figures on paper: 10-ton capacity, 22.5 m span, 9 m lifting height, and duty class A5. Yet their prices differ by 30%. Most buyers will ask, “Why is one supplier more expensive?” A far better question, however, is: “Which terms in these two specification sheets carry different practical meanings?”

A specification sheet serves more as a screening tool rather than a contract. Suppliers draft specs to showcase their capabilities. They often make the document look comprehensive while leaving descriptions ambiguous. Critical parameters that truly determine durability and reliability — such as maximum wheel load, main girder plate thickness, camber tolerance, and the number of brakes — frequently appear only on drawings, or are omitted entirely.

The following sections interpret the parameters sequentially in the standard order of a specification sheet. It covers the key parameters to prioritize, common wording variations for each item, follow-up questions to raise when encountering vague language, and how to align data from both sheets into a single comparison table.

---

## What a Specification Sheet Does, and What It Hides

### A filter, not a promise

A specification sheet proves one thing: the supplier knows which parameters belong on the page. It cannot prove those parameters are true, and it cannot prove they suit your duty.

The technical agreement and the contract annex carry the binding force. Reading with that in mind means asking not "does this comply" but "where does this stay unclear, and what must the technical agreement add".

### Three systematic gaps

The first gap is assumption, and it hides behind every number. Every number rests on a set of them: ambient temperature, standard supply voltage, rail already aligned, load evenly spread. Leave those assumptions unwritten and the numbers stand on nothing.

The second gap is definition, and it costs more than the first. The same word means different things under different pens. Span, capacity, duty class, and speed each carry at least two readings.

The third gap is boundary, and it drives most later cost. A sheet describes one machine and skips the interfaces: wheel load and rail to the building, voltage and capacity to the supply, segmentation to transport. Extra cost collects there.

## Capacity, Span, Lift Height, and Duty Class

### Rated capacity and attachment weight

Rated capacity normally means the load under the hook, excluding attachment weight. Not every supplier reads the line that way.

One sheet reads "10 t including 500 kg attachment", which leaves 9.5 t of real lifting capacity. Another reads "10 t with C-hook", while the C-hook itself weighs 1.2 t and nobody deducted it. A third applies derating at long span and hides a line in the corner: "span over 25 m, capacity reduced to 80%".

Ask whether rated capacity already deducts attachment weight, and whether derating applies at the nominal span.

### Where span definitions diverge

Span in an [overhead crane](https://yzcranes.com/product-category/overhead-crane/) normally means the horizontal distance between rail centre lines. On paper you will meet three versions: rail centre distance, clear building width, and the hook's effective coverage.

Those three can differ by more than two metres. Span sets girder bending moment directly, so it drives girder section and total machine weight. Few parameters in the table move price harder than span.

Ask whether that span runs rail centre to rail centre or clear building width, and whether the rail already exists and in which model.

### Lift height and headroom

Lift height needs an agreed datum. Two readings dominate: floor to hook closed position, or rail top to hook closed position. They differ by the rail top elevation, usually 8–12 m.

Headroom is the item that slips through. A sheet says "lift height 9 m" and never says how much space separates the trolley's highest point from the beam underside at the upper limit. That margin decides whether the machine fits the building you already own.

Ask which datum the lift height uses, and what elevation the trolley reaches at the upper hook limit.

### Duty class: FEM, ISO, and CMAA are not one thing

This row causes more misreading than any other in the sheet.

FEM 1.001 groups the whole machine and also groups each mechanism. ISO 4301-1 uses a different framework, combining utilisation class with load spectrum. CMAA 70 uses classes A to D, with higher classes in some applications, and describes intensity of use rather than a numeric code.

"A5" may therefore point at a machine duty class or at a mechanism duty class. Where one supplier reads machine and another reads mechanism, structural steel weight can differ by 15%–25%.

Ask whether the class covers the machine or the mechanism, which standard system graded it, and what daily cycles and load spectrum sit behind it.

| Parameter | How sheets usually write it | What you should ask |
| --------- | --------------------------- | ------------------- |
| Rated capacity | "10 t" | Whether attachment weight is deducted; whether derating applies at long span |
| Span | "22.5 m" | Rail centre distance or clear width; rail model and installation state |
| Lift height | "9 m" | Datum at floor or rail top; trolley elevation at the upper hook limit |
| Duty class | "A5" | Machine or mechanism; which standard system graded it |
| Hoisting speed | "8/0.8 m/min" | Two speed or stepless VFD; lowest stable speed |
| Motor power | "13 kW" | Duty type and cyclic duration factor; insulation and protection class |
| Brake | "electromagnetic brake" | How many sets; whether dual braking; whether manual release exists |
| Girder material | "Q355B" | Plate thickness; stiffener layout; weld quality level |
| Protection class | "IP54" | Rating per part; whether cabinet and motors match |
| Coating | "two topcoats" | Coating system and total film thickness; which corrosion category |

## Speed, Motors, and Drives

### Reading speed across three mechanisms

Speed splits into three mechanisms: hoisting, trolley travel, and bridge travel. Common ranges run 0.5–8 m/min for hoisting, 20–40 m/min for trolley travel, and 20–80 m/min for the bridge.

Each of those three notations describes a different machine. "8 m/min" is single speed. "8/0.8 m/min" is two speed, with nothing between the steps. "0–8 m/min" is stepless VFD, able to stop anywhere.

At a station that needs accurate positioning, the gap between two speed and VFD is decisive. The low step on a two-speed [electric hoist](https://yzcranes.com/product-category/electric-hoist/) often stays too fast, so the operator inches the load with repeated jogging. Hundreds of jogs a day wear contactors and brakes hard.

Ask whether the drive is two speed or VFD, what the lowest stable speed is, and whether a jogging limit applies.

### VFD and energy use

Three questions cover the drive: brand and model, open or closed loop, and whether energy regeneration is present.

Brand affects spare part availability, closed loop affects low-speed torque and positioning accuracy, and regeneration affects the long-run power bill where the hoist lowers often. Sheets compress all three into "VFD control", which says nothing useful.

### Motor insulation and protection

Insulation class commonly reads F, with H used in hot or metallurgical service. Motor protection commonly reads IP55, and the control cabinet IP54 or better.

Duty type matters as much. IEC 60034-1 defines S1 continuous and S3 periodic duty among others, so a power figure without a duty type is incomplete. The same 13 kW behaves quite differently at S1 and at S3 40%.

Ask what duty type the motor carries, what cyclic duration factor applies, and what insulation and protection classes the sheet claims.

### Brake type and count

Three brake types dominate: electromagnetic disc, electro-hydraulic thruster, and the cone rotor motor's built-in brake. Response, maintenance, and failure mode differ across all three.

Count matters more. Where a crane handles dangerous goods or molten metal, codes usually call for two independent brakes so one failure still stops the load. A sheet reading "electromagnetic brake" with no count has answered nothing.

Ask how many brake sets the machine carries, whether they are two independent units or two shoes on one unit, what braking torque applies, and whether manual release exists.

## Structure and Materials

### Girder section and material

[Single-girder machines](https://yzcranes.com/product-category/single-girder-overhead-crane/) commonly use rolled I-beams or welded box sections, and double-girder machines use box girders. Q235B and Q355B are the usual grades, and the higher strength grade allows thinner plate at the same load.

"Q355B" states a grade and says nothing about plate thickness. Thickness drives steel weight, which drives much of the price gap between suppliers. Two nominal 10 t, 22.5 m double-girder machines with 6 mm and 8 mm webs are two different machines.

Ask for web and flange thickness, stiffener spacing, and a girder cross-section drawing.

### Camber and deflection

Camber is the pre-set rise in an unloaded girder, commonly around 1/1000 of span with tolerance set by the applicable standard, and too little camber lets the girder sag under load, raises trolley climbing resistance, and accelerates wear over years of running.

Deflection is the sag under rated load, commonly limited to around 1/800 of span for overhead cranes, subject to standard and duty class. Both figures rarely appear in the parameter table, so ask for them. Look in the girder calculation or on the general arrangement drawing.

Ask for the measured camber with its tolerance band, and the calculated deflection at rated load.

### Coating and weld quality

Do not read the coating as a number of coats. Read the system and the total film thickness. ISO 12944 sorts corrosive environments into C3, C4, and C5, and each level implies different primer type, film thickness, and surface preparation. A dry indoor workshop sits fine at C3, while a coastal or chemical site usually needs C4 or above.

Welds need a quality level. ISO 5817 grades weld quality, and a primary load-carrying joint carries a different requirement from a general connection. A sheet reading "full welds, no defects" offers adjectives instead of a standard.

Ask which ISO 12944 category the coating targets, what film thickness applies, and which ISO 5817 level governs welds.

## Electrical Systems and Protection

### Control voltage

Control circuit voltage commonly runs 24 V DC, 48 V AC, or 220 V AC. Safety thinking favours the lower voltages, because an operator keeps a hand on the pushbutton and the pendant all shift.

IEC 60204-32 sets systematic requirements for crane electrical safety, covering emergency stop, isolation, protective earthing, and the safety principles of control circuits. A sheet reading "control voltage 220 V" is not wrong, yet it deserves one more question about why.

Ask what the control circuit voltage is, and whether the emergency stop breaks the circuit in hard wiring or through the PLC.

### IP ratings and insulation class

Read an IP rating part by part. A single IP54 for the whole machine may mean motor, cabinet, and pushbutton box all reach IP54. It may also mean only the cabinet does. In wet, dusty, or washdown areas, a per-part rating table beats one machine-level number.

Insulation class works the same way. Motor insulation class and the temperature rating of components inside the cabinet are separate matters, so keep them apart.

Ask for a per-part protection table covering the cabinet, motors, limit switches, and pushbutton boxes.

### Safety circuits and performance level

ISO 13849-1 describes safety-related control reliability through performance level, PL a to e, and category, Cat. B to 4. Overload protection, emergency stop, and limit functions usually need a defined PL.

The structure deserves the closest look, starting with whether the safety circuit runs independently of the main PLC.

Ask which PL and category the safety circuit reaches, whether safety functions stay independent of the main PLC, and whether a circuit diagram comes with the machine.

## Three Items Suppliers Usually Leave Out

### Maximum wheel load

Maximum wheel load belongs in every specification sheet. It appears in few.

It decides rail selection and the load check on the building girder. Understate the wheel load and the rail gets chosen too light, which shows up years later as rail crushing and wheel tread spalling, and no warranty covers it by then. Understate the girder check and the problem turns structural.

Ask for the maximum wheel load in kN, the condition that produces it, and the four individual wheel loads.

### Rail selection and interfaces

The rail model must match the wheel load. Where a sheet says "suitable for QU70", confirm whether that follows the maximum wheel load or a rule of thumb. Then settle three things in the technical agreement: who supplies the rail, who installs and aligns it, and who signs off accuracy.

### Transport segmentation and site splicing

Girder length decides the transport method. A standard container measures about 12 m inside, so a longer girder ships in sections or moves by special transport.

Sections bring site splicing: bolted or welded, whether camber gets re-measured afterwards, who does the work, and who pays. Sheets leave this out, and it returns during execution as an argument about schedule and cost.

Ask whether the girder ships whole or in sections, what joint form the splice uses, and who handles splicing and re-measurement on site.

## How to Compare Two Specification Sheets

### Normalise onto one table

Comparison needs one set of definitions. Build a normalisation table, convert both sheets onto it, then compare row by row.

| Comparison item | Supplier A | Supplier B | Difference after normalising |
| --------------- | ---------- | ---------- | ---------------------------- |
| Capacity | 10 t including 0.5 t attachment | 10 t | A gives 9.5 t of real lifting capacity |
| Span | 22.5 m clear width | 22.5 m rail centre distance | A carries a longer calculated span and more steel |
| Lift height | 9 m from rail top | 9 m from floor | With a 9 m rail height, B lifts 9 m more |
| Duty class | A5, machine | M5, mechanism | Not directly comparable, needs conversion |
| Hoisting speed | 8/0.8 m/min, two speed | 0–8 m/min, VFD | B positions steplessly, A can only jog |
| Brake | one electromagnetic brake | two electromagnetic disc brakes | B meets dual braking on dangerous duty |
| Girder web | not stated | 8 mm | A needs a question, possibly 6 mm |
| Maximum wheel load | not provided | 165 kN | A leaves the building girder unchecked |
| Coating | two topcoats | ISO 12944 C4, 240 μm | Clear gap in corrosion protection |
| Machine weight | 12.5 t | 15.8 t | B is heavier, usually thicker plate |

Fill that table and the reason behind a thirty percent gap usually surfaces. Span definition, plate thickness, brake count, and corrosion category together explain most of it.

### Common definition traps

Trap one compares total machine weight. Lighter does not mean more advanced, since it often just means thinner plate. Weight compares only under three constraints at once: same capacity, same span, same duty class.

Trap two compares motor power. More kilowatts does not mean more capability, because it may only mean lower efficiency or an oversized margin, and either one raises energy use.

Trap three compares duty class directly. As noted earlier, different systems do not map onto each other by number.

Trap four hides better, and it means accepting the phrase "standard configuration". Every place that phrase appears marks a place the sheet left unclear.

Yuzhong adds a definition page after the parameter table on every customer specification. It states whether capacity deducts attachment weight, that span follows rail centre distance, and how duty class grades. The page exists so a buyer can set it beside two other offers and compare row by row.

Yuzhong also puts five items into the same file: maximum wheel load, girder plate thickness, camber tolerance, brake count, and coating corrosion category with total film thickness. Those five hide most easily during price comparison, and surface most often three years into service.

## Frequently Asked Questions

### 1. Where does span start and end?

Span in an overhead crane normally means the horizontal distance between the two rail centre lines. A sheet may also state clear building width or the hook's effective coverage, and those three can differ by more than two metres. Confirm that row first, because it sets the calculated span and the steel behind it.

### 2. Are duty class A5 and M5 the same thing?

No. A5 usually numbers a machine duty class, while M5 usually numbers a mechanism duty class, and the two sit at different classification levels. They do not convert directly. Standard systems also grade on different bases, so any class deserves the same two questions: machine or mechanism, and which system.

### 3. Why does wheel load matter so much?

Because wheel load decides rail selection and the building girder check at the same time. Without it you cannot confirm whether the existing rail carries the machine or whether the crane girder needs strengthening. Finding that mismatch at installation costs more than the price gap between two machines ever did.

### 4. What does "single speed" mean on a sheet?

It means hoisting runs at one fixed speed with no slow step. That suits a fixed cycle with no need for accurate landing. Where a station needs a slow approach, the operator can only jog the load repeatedly, and contactor and brake wear climb fast. Seeing "single speed", confirm that the station truly never needs slow speed.

### 5. How to tell whether a parameter is inflated?

Three moves cover it. Ask for the calculation report rather than the parameter table, since girder section and wheel load figures must reconcile. Ask for measured records from a machine of the same specification, such as camber readings, no-load current, and braking distance. Then write the key items into the technical agreement with an acceptance method, so an inflated number becomes a breach.